The UTILITY INDUSTRY is fast paced, detail oriented, and focused on worker and public safety.  At Praxis, we understand this and strive to provide our services in a quick and safe manner while also helping solve problems that arise during the planning, design, and construction of a project. 

SEMPRA ENERGY - PIPELINE SAFETY ENHANCEMENT PLAN   From September 2013 - December 2016, Praxis worked with Jacobs Engineering, Sempra Energy's Southern California Gas, and San Diego Gas & Electric to implement their Pipeline Safety Enhancement Plan (PSEP) from San Luis Obispo County and Kern County south to the Mexico Border.      Topographic Survey  |  Boundary Survey  |   Construction Staking  |  Utility Survey (S.U.E.)   | Control Survey

SEMPRA ENERGY - PIPELINE SAFETY ENHANCEMENT PLAN

From September 2013 - December 2016, Praxis worked with Jacobs Engineering, Sempra Energy's Southern California Gas, and San Diego Gas & Electric to implement their Pipeline Safety Enhancement Plan (PSEP) from San Luis Obispo County and Kern County south to the Mexico Border.   

 Topographic Survey  |  Boundary Survey  |   Construction Staking  |  Utility Survey (S.U.E.)   | Control Survey

DUCOR DISTRIBUTION & TRANSMISSION LINE   Working with Dashiell Corp. in summer 2016, Praxis helped with the design and construction of 2 miles of distribution lines which brought 80MW of power from four different sites to one location, and 1 mile of transmission line that tied the four substations to the Southern California Edison grid.   Control Survey  |  Topographic Survey  |  Boundary Survey  |  Constructability Review  |  S.U.E.  |  Construction Staking

DUCOR DISTRIBUTION & TRANSMISSION LINE

Working with Dashiell Corp. in summer 2016, Praxis helped with the design and construction of 2 miles of distribution lines which brought 80MW of power from four different sites to one location, and 1 mile of transmission line that tied the four substations to the Southern California Edison grid. 

Control Survey  |  Topographic Survey  |  Boundary Survey  |  Constructability Review  |  S.U.E.  |  Construction Staking

HENRIETTA TO LEPRINO TRANSMISSION LINE   From December 2015 to February 2016, Praxis provided survey services to Summit Line Construction for the installation of over 2 miles of transmission line that tied the Henrietta Substation to the Leprino switching station outside of Lemoore, CA.   Constructability Review | Construction Staking

HENRIETTA TO LEPRINO TRANSMISSION LINE

From December 2015 to February 2016, Praxis provided survey services to Summit Line Construction for the installation of over 2 miles of transmission line that tied the Henrietta Substation to the Leprino switching station outside of Lemoore, CA. 

Constructability Review | Construction Staking

SALADO SUBSTATION   In November 2013, Praxis worked with Clark Brothers and Dashiell to locate proposed improvements and upgrades to PG&E's Salado Substation modernization project. This expansion project included the installation of new equipment and the development of previously unused portions of the substation facility in Patterson, CA.  Control Survey  |  Construction Staking

SALADO SUBSTATION

In November 2013, Praxis worked with Clark Brothers and Dashiell to locate proposed improvements and upgrades to PG&E's Salado Substation modernization project. This expansion project included the installation of new equipment and the development of previously unused portions of the substation facility in Patterson, CA.

Control Survey  |  Construction Staking

ALPAUGH - PG&E INTERCONNECT FACILITY

Working with Manual Brothers, Inc., Praxis helped construct the Alpaugh Interconnect Facility, which is the connection facility between existing and new transmission lines bringing 70MW of solar power into PG&E’s grid

Topographic Survey  |  Boundary Survey  |  Construction Staking  | Title & Map Research  |  Quality

PG&E - LAS AGUILAS SWITCHING STATION   From July through December 2016, Praxis worked with Clark Bros. Inc. and Dashiell Corp. to build the Las Aguilas Switching station that will tie the 240MW Panoche Valley Solar project to the grid.    Construction Staking  |  Control Survey  |  Constructability Review

PG&E - LAS AGUILAS SWITCHING STATION

From July through December 2016, Praxis worked with Clark Bros. Inc. and Dashiell Corp. to build the Las Aguilas Switching station that will tie the 240MW Panoche Valley Solar project to the grid.  

Construction Staking  |  Control Survey  |  Constructability Review